Unitranche fair value: why par is not the answer

By 5 min readLire en français

A private debt fund holds a €10M floating-rate unitranche. The borrower pays its coupons on time, covenants are met, and the line has been carried at par since origination. At quarter-end the auditor asks one question: what supports the claim that this loan is still worth €10M? "There has been no payment default" answers an impairment question. Fair value asks a different one: what price would a market participant pay for these cash flows today, at the yield they would require today?

Par is a starting point, not a method

Fair value is an exit price at the measurement date (IFRS 13, §9). For a loan, that price depends on the yield the market requires for this risk on that date, not on the amount written in the contract. The IPEV Valuation Guidelines (December 2025 edition, §5.6) are direct about it: a market participant takes into account risk, coupon, time to expected repayment and other market conditions, and the resulting fair value may not be equivalent to face value. The same section adds that par, face or cost value is not automatically fair value, even when enterprise value is sufficient to cover the liability.

The expected technique is a discounted cash flow on the instrument itself (§3.8): a loan's cash flows can be predicted with reasonable certainty (§5.6), which is what makes the calculation defensible. Carrying the loan at par remains possible, provided it is the outcome of a calculation and not a default position.

Calibrate the spread at issuance

The first piece of work happens on the day of the investment. The price at which the loan was issued may be a reliable indicator of fair value at that date, depending on facts and circumstances (§5.6). From it, the valuer derives the implied spread: the one that, added to the rate curve on the issuance date, brings the present value of contractual cash flows back to the price actually paid. That is calibration in the sense of §2.6.

The implied spread is not always the contractual margin. An arrangement fee or an original issue discount lowers the entry price below par, and the yield the lender actually required then exceeds the headline margin. If the ticket carries a warrant, its value is separated out before the yield of the debt component is calibrated, as covered in our article on valuing the equity kicker.

The calibrated spread then serves as an anchor. At later dates the question becomes: how far has the required yield moved from that starting point, and why?

Floating rate: the base nets out, the spread does not

A unitranche is most often indexed to Euribor. When the base rate rises, future coupons rise with it, and so does the discount rate: the two effects largely offset. A floating-rate loan therefore has little sensitivity to the level of rates, subject to floors and to the lag between two fixings.

It remains fully sensitive to the spread. The contractual margin is set for the life of the loan; the spread the market requires moves with the borrower's credit quality and with conditions in the debt market. IPEV asks the valuer to consider, at each measurement date, any indications of changes in credit risk, positive or negative, and any changes in required yield (§5.6). A fixed-rate loan carries both sensitivities.

A worked example

Let us take a worked example. It is illustrative and uses round numbers. A €10M unitranche, repayable at maturity, has four years left to run. It pays an annual coupon of Euribor plus 600 basis points, which is the spread calibrated at issuance at par. For simplicity, the base rate is assumed flat over the remaining term.

Situation at the measurement dateCouponDiscount rateFair value% of par
Base 2%, required spread unchanged at 600 bps8%8%€10.00M100.0%
Base 4%, required spread unchanged at 600 bps10%10%€10.00M100.0%
Base 2%, required spread at 800 bps8%10%€9.37M93.7%
Base 2%, required spread at 500 bps8%7%€10.34M103.4%

The second row shows the offset: the base rate doubles and the value does not move. The third shows what par was hiding: with no payment incident at all, a 200 basis point widening takes €0.63M off the line. The fourth calls for judgement: if the borrower can prepay at par, a market participant will not pay 103.4% for cash flows that may stop tomorrow. Time to expected repayment is an assumption in its own right, not the contractual maturity by default.

What the file should show the committee

Four items let a committee challenge a loan's value on substance:

  • the issuance spread and the entry price it was derived from;
  • the spread used at the measurement date, with the source of the change: movement in the borrower's leverage or internal rating, or a shift observed on comparable financings;
  • the rate curve used and its date, which must be the measurement date;
  • the expected repayment date, and the sensitivity of value to a spread shock.

A non-performing loan falls outside this framework: IPEV considers it differently from performing debt, and value is then reasoned on expected recovery.

In Jolv's private debt valuation module, the Z-spread can be calibrated to the entry price using the curve at the issuance date, and the remaining cash flows are then discounted from the measurement date; the market rates used are recorded with the method, and spread sensitivities accompany the result. The detail by instrument family is on the valuation methods page.

Sources

Read next

Discover Jolv with a private demo

30-min demo with our team. No commitment, tailored to your process.